← To the organ index
Atlas programme · Version 1.1 · 7 October 2026

A European atlas of organs.

Instruments, construction history, workshops and places: a connected directory with traceable sources and a shared drawing language.

European leadership is a goal. The stages below describe planned expansion, not functions already available.

Verified starting catalogue

1,860Catalogue entries
1,545Entries with specifications
1,756dated event evidence

Catalogue entries may contain historical construction and location states. They are not yet a count of distinct instruments. The baseline audit did not automatically merge instruments.

The reference atlas is available

10 instrument profiles, 5 workshops and 5 sites are linked to construction states, overhauls and sources. The individual drawing series will follow separately.

Open the reference atlas →

The stages

E00 · Completed

Review the project charter, drawing standard and catalogue

Binding target and reliable starting point.

Scope and completion

Airtable plan; ARCHIV/01 drawing standard; relational schema; audit of all 1,860 existing catalogue entries.

Acceptance: Airtable records read back; schema and integrity rules tested; audit reproducible; existing website remains functional.

E01 · In progress

Identities and historical data model

Do not confuse instruments with locations or construction states.

Scope and completion

Instruments, construction states, works, people/workshops, sites, location periods, sources, supported claims and images.

Acceptance: Permanent IDs; preserve links; justify every merge; no automatic merges based on names alone; count current and historical instruments separately.

E02 · In progress

Reference package: 10 organs, 5 builders, 5 sites

Make the full product usable through verifiable examples.

Scope and completion

Linked profiles, construction histories, specifications, source views and 20 visual profiles following ARCHIV/01.

Acceptance: 10/5/5 profiles accessible; every historical claim sourced; image rights resolved; illustrations correctly labelled; mobile layout checked.

E03 · Planned

Drawing system and media production

Recognizable visual documentation faithful to sources.

Scope and completion

Organ view; site view/plan; workshop view or company history; versions for each construction state.

Acceptance: Source class and date on every sheet; no invented dimensions, hidden components or workshops; detailed review of each asset.

E04 · Planned

Switzerland: canton by canton

Document Swiss sources comprehensively and keep gaps visible.

Scope and completion

Remaining Zurich technical cases; then LU, SG, SH, TG, FR, VD, NE, JU, VS, GR, TI, SZ, ZG, GL, UR, OW, NW, AR, AI; continue reviewing existing cantons.

Acceptance: Every discovered source row imported, merged or left open with a reason; no unsupported completeness claims; renovations included.

E05 · Planned

France: source rights and département packages

Integrate the national collection with legally sound rights.

Scope and completion

API/licence review; source mapping; département packages; owner and builder sources for histories.

Acceptance: Licence and attribution documented per source; geographical coverage shown; distinguish construction, restoration and relocation.

E06 · Planned

Germany: state packages

Systematically connect breadth and historical depth.

Scope and completion

Baden-Württemberg and Bavaria first; then other states; works catalogues and church sources.

Acceptance: Geographical coverage, duplicates, source conflicts and missing specifications reported for every package.

E07 · Planned

Organ builder dictionary and works catalogues

Document all verifiable historical and present-day European organ builders.

Scope and completion

People, companies, workshop locations, founding/succession, documented teaching relationships, new builds and maintained instruments.

Acceptance: Do not equate name variants without evidence; separate construction/rebuilding/restoration roles; works catalogue with sources and coverage status.

E08 · Planned

Other European countries

Extend the European ambition beyond CH/FR/DE.

Scope and completion

AT, NL, BE, LU, IT, ES, PT, UK, IE, the Nordics, Central/Eastern and Southeastern Europe as sources allow; maintain complete country registers.

Acceptance: Document the definition of Europe and country list; show coverage and gaps on every country page; apply the same quality rules as the core countries.

E09 · Planned

Site atlas

Sites as distinct profiles with readable histories.

Scope and completion

Building identity, names, history, present/former instruments, documented organ placement and visitor information.

Acceptance: Coordinates with accuracy and source; no unsupported public access claims for private sites; relocations historically traceable.

E10 · Planned

Search, map, comparison and languages

Offer a measurably better research experience.

Scope and completion

DE/FR/EN first; map; combined filters; specification comparisons by state; translated explanations, original technical terms.

Acceptance: Reference queries return documented results; comparisons identify incompatible states; keyboard/mobile use; source language visible.

E11 · Planned

Editorial work, corrections and specialist partners

Ensure ongoing updates and verifiable quality.

Scope and completion

Submissions from owners/builders; moderation; revision log; roles; rights and deletion/correction procedures.

Acceptance: No unverified submissions marked confirmed; audit trail and withdrawal; contact only with separate authorization.

E12 · Planned

Competitive evidence and public quality reports

Substantiate leadership with comparable metrics.

Scope and completion

Comparison matrix; uniquely identified instruments, country coverage, source proportion, historical depth, media quality and currency.

Acceptance: No superlatives without a current dated comparison of equivalent populations; do not count construction states as extra instruments.

ARCHIV/01 drawing standard

Technical pen drawing, clear provenance.

Quiet views, fine lines and a legible title block. Original plans, documented reconstructions and schematic illustrations are clearly distinguished. A drawing without a measurement source is marked “Not to scale”.

Paper #F5F2EAInk #202B32Guide line #BCC4C7Change #A5543D
Z01 · ARCHIV/01 — technical pen drawing

Light architectural drawing: paper #F5F2EA, ink #202B32, guide lines #BCC4C7, documented changes #A5543D. No photorealistic rendering, artificial ageing or dramatic lighting. Consistently quiet museum and workshop aesthetics.

Review: Every image follows the same palette; information remains distinguishable without colour.

Z02 · Sheet formats and line weights

Organ view A4 portrait, building plan A4 landscape, company history A4 landscape; responsive screen derivatives. At A4: outline 0.35 mm, components 0.18 mm, guides/hatching 0.10 mm. White space at least 8% of the page. Clear sans-serif labels, monospace title block and IDs.

Review: Line hierarchy legible in print and at 320 px width; complete font licences.

Z03 · Organ profile: view and documented structure

Primarily a frontal façade view from a specific reference; no invented symmetry. Sections, side views, division layout or console only with sufficient evidence. Count façade pipes only when visibly documented; do not infer total pipe count.

Review: Reference, perspective, depicted state and simplifications documented.

Z04 · Site profile: building and organ position

View of the actual building from a documented reference. Floor plans and organ positions only with a suitable plan or reliable documentation. North arrows, floors and scale require evidence. No invented interiors.

Review: Plan source and position verified; do not draw uncertain positions precisely.

Z05 · Builder profile: workshop or company history

Workshop façade from a verified image reference. Without one: graphic company history, documented workshop sites or successions; no invented workshop or portrait. Keep person and company profiles separate.

Review: Every location, person and succession statement has a source; graphic substitutes explicitly identified.

Z06 · Three evidence classes on every sheet

A ORIGINAL PLAN: authentic plan with provenance and usage rights. B DOCUMENTED RECONSTRUCTION: derived from identified documents; assumptions separate. C SCHEMATIC ILLUSTRATION: a design representation, not dimensionally accurate. AI-generated images default to C and are additionally labelled AI-assisted.

Review: Class visible in the title block; never present an AI image as an original plan or survey.

Z07 · Dimensions, gaps and scale

Dimensions only from reliable measurement sources. Without one: “Not to scale”. Omit unknown parts or mark them undocumented. No substitute technical dimensions inferred from image proportions.

Review: Every numeric dimension traceable; no fictitious plan precision.

Z08 · Required title block

Object ID, title, site, depicted state/year, drawing version, evidence class, scale or Not to scale, reference/source ID, creator/rights, review status, date. Source references can be linked outside the drawing.

Review: No released sheet without complete metadata.

Z09 · Historical states and comparison

One sheet depicts a defined state. Comparison sheet using the same view: existing parts black, documented additions rust-red and labelled, removals dashed. Do not show unknown parts as removed.

Review: Changes match dated events; status is not conveyed by colour alone.

Z10 · Files and quality assurance

Prefer SVG masters for verified vector drawings or high-resolution raster for free illustrations; PDF for print, WebP/PNG for web. Raster master 300 dpi at A4 where the reference permits. Version original, derivative and web files separately.

Review: Do not present an upscaled file as a more detailed original; do not remove third-party watermarks; visually inspect every image.

Large, verifiable work packages

Up to 2,000 licensed structured records in a preparatory import; up to 500 research candidates and 250 editorially reviewed profiles per release. In-depth packages include up to 25 builders, 50 sites or 20 individually reviewed drawings. Complex sources lead to smaller packages.

Every completed stage requires verifiable evidence. This plan does not initiate automatic background work.